1944
Development and supply of Centrifugal Pump.
1947
Vertical Turbine Pump for bore well application.
   
1952
Introduction of Unibuilt Monoblock Pump for Agricultural application.
1963
Entry into large sophisticated Pumps of Mixed Flow design in Horizontal Split-Casing and Vertical Turbine Pump.
   
1965
Introduction of Non-Clog Pump for Sewage application
1970
Development and supply of largest Vertical Propeller pump of 1500 VP size for Dry Dock application for flow. of 3,60,000 LPM.
   
1971
C.W. Pump of 900 VM size for Thermal Power Station for flow 1,36,000 LPM.
1973
Vertical Propeller Pump for very low head requirement of 7 mtr. for water supply.
   
1974
First Cooling Water Pumps (CW Pump) of 1200 mm size for Nuclear Power Station for flow 1,89,250 LPM and head 7.50 M.
1975
Vertical Turbine Pumps exported to Malaysia.
   
1977
Moderator Pump developed for Nuclear Power Station.
1978
Export order for a turnkey project of  Chitwan Lift Irrigation  Scheme of Nepal for  750 T size to 1050 VM Pumps awarded and executed against global competition.
   
1979
CW Pumps supplied for Sea Water application to Thermal Power Station.
1988
Turnkey project of large Lift Irrigation Scheme with 14 Nos.750 T Pumps alongwith Jyoti 620 KW HT Motors executed for flow of 58200 LPM and Head 50.14 Vishnupuri Project.
   
1995
Propeller Pump for duel speed operation developed for Defence.
1996
CW Pump in Horizontal Split-Casing construction supplied to Essar Power Project.
   
2000
Development and supply of large vertical mixed flow pump of 1200VM size for Purender Lift Irrigation  scheme for head of 65.5  mt. with Jyoti 2150kW HT  Motor.
2009
14 nos Large Metallic Volute pumps with motor ratings ranging from 4 to 13.6 MW installed for Godavari Lift Irrigation Project at AP , with technical tieup with Czech republic companies m/s CBE & Sigma.
   
2010
Largest split casing pumps 1200 HS supplied to WRD Patna Project.

Largest CW pumps for NTPC Aravalli project 1600 VM size under execution with technical tie up with m/s Hyosung Ebara Korea .
 
   
   
 
Highlights
 
JYOTI meets the quality standard of various prestigious consultants like DCL, Tata Consulting Engineers (TCE), Engineers India Ltd. (EIL), National Thermal Power Corporation (NTPC), UHDE India, L&T, MECONS etc.
 
JYOTI'S strength today is due to its full fledged R & D centre established in 1963 working for continuous development and performance improvement of the Pumps to be competitive in global competition.
 
 
 
Home   I   About us   I   Contact us   I   Sitemap   I   Disclamer
 
Copyright(c)2008 - Jyoti Ltd... All Right Reserved .
                                                       Best view in IE 6
Website Designed by : Grace N Bless Infotech