Projects Photo

  • Make-Up Water Pump house for Adani Thermal Power Project, Tiroda (3x660MW)
  • “Jyoti” make 3 Sets 1400VM Pump & 2200KW, HT Motor installed at Adani Thermal Power Project, Tiroda (3x660MW)
  • Pump house for Drinking water supply scheme at Tumkur & Tiptur – Cauvery Neeravari Nigama Ltd.
  • 6.6 Kv HT & 415 Volt LT Panel installed at Adani Thermal Power Project, Tiroda (3x660MW)
  • 415 Volt LT Panel installed at Tumkur & Tiptur – Cauvery Neeravari Nigama Ltd.
  • “Jyoti” make 4 Sets 350HS Pump & 315KW, LT Motor installed at at Tumkur & Tiptur – Cauvery Neeravari Nigama Ltd.
  • “Jyoti” make 6 Sets 1200VM Pump & 2100KW, HT Motor installed at Indi Lift Irrigation scheme, Karnataka 1800mm Delivery Line
  • “Jyoti” make 4 Sets 350HS Pump & 2 Sets of 300HS pump with 460KW & 200KW Motors having CACA enclosure for NC-25
  • 1200KVA & 120KVA transformer at NC-25 project.
  • 11 Kv & 415 V Switchgear room & PLC-SCADA room for NC-25.
  • 33Kv Substation at Punasa Lift Irrigation Scheme
  • “Jyoti” make 3 Sets 1200VM Pump & 1750KW, HT Motor installed at Punasa Lift Irrigation Scheme
  • “Jyoti” make 6 Sets 1000VM pump& 1700KW motor installed at Jalundra Pumping Station, Gujarat
  • “Jyoti” make 14 Sets 750T pump & 620 KW motor installed at Vishnupuri Lift Irrigation Scheme, Maharashtra
  • Erection of Metallic Volute Pump Draft tube at Intake pump house for Godavari Phase –II
  • Erection of 13.2MW,11KV,500 rpm Motor at Dharamasagar Pump house for Godavari Phase –II
  • Spiral Casing with Outlet Piece for MVP, Q =25200Cum/hr, Motor Rating – 13.5 MW , Weight= 25 Ton
  • 4MW,11KV Motor at Gandiramaram pump House for Godavari Phase –II
  • HT & LT Switch gear room at Godavari Phase –II
  • CW Pump Erected and Commissioned at NTPC Jhajjar Q=30,000 cum/hr Motor Rating – 2800 KW
  • Battery of pumps for wagholibutti life irrigation scheme
  • Testing of CW Pump for NTPC Jhajjar Q=30,000 cum/hr Motor Rating – 2800 KW at Jyoti Works.